How Can AAC Help You? Credentials & Experience Research and Thought Leadership About AAC Doing Business With AAC

AAC Services Offered

//

Joint Capabilities Integration and Development System (JCIDS) Services
// Defense Acquisition System Services
// Planning, Programming, Budgeting and Execution (PPBE) Process Services

Engineering Expertise

//

Systems Engineering
// Logistics Engineering
 
< BACK

Capability Production Document (CPD)

Upon completion of EMDD, the PM delivers a Capability Production Document which addresses the production elements specific to a single increment of an acquisition program. The primary objective of the CPD is to describe the actual performance of the weapon system that will go into production. The primary difference between a CPD and a CDD is that the CPD is informed by the lessons learned during the development process. The JROC objective in approving the CPD is to ensure that the weapon system being delivered meets the needs originally defined in the ICD at an affordable cost. If the weapon system does not meet all of the threshold levels for the KPPs, the JROC will assess whether or not the weapon system remains operationally acceptable. AAC engineers assist PMs in rewriting this document for each increment in an evolutionary acquisition program. This includes refining Key Performance Parameters (KPP), performance attributes, and cost and engineering estimates.

The approved CPD becomes the basis for the MDA decision to approve low rate initial production (LRIP) of the system at Milestone C.

 

201 Mill Street, 2nd Floor | Rome, NY 13440 | Phone: 315.336.2071 | Fax: 315.334.1371 | E-mail
©2014 AAC - Advanced Automation Corporation
Privacy Policy | Site Map
Site by: J.E.G. Design, Inc.